Welcome to Zibo Dingchang Xinlong Plastic Technology Co., Ltd

 Untitled-3.png

 Universal banner
Your current location: home page > News > Corporate News

contact us

Zibo Dingchang Xinlong Plastic Technology Co., Ltd

mobile phone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Telephone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Fax: 0533-3984111

website: daliren.cn

Email: [email protected]

Address: No. 37, Min'an Road, Zibo High tech Zone


Precautions for construction and installation

2019-07-13
second

 Ultra wear-resistant composite pipe

   Ultra wear-resistant composite pipe It is suitable for cold and hot water supply for buildings and home decoration, central air conditioning, radiator heating pipe system, and is a new generation of high-quality composite pipes. What should be paid attention to during construction and installation?

1. Before pipeline installation, the installation personnel must be familiar with the general performance of PE pipes, master the necessary operating points, and prohibit blind construction.

2. The appearance of materials and the tolerance of joint fit shall be carefully checked during the installation of ultra wear-resistant composite pipe system, and the dirt and sundries inside and outside the pipes and fittings must be removed.

3. During the installation of the pipeline system, prevent the paint, asphalt, etc. from contacting the PE pipe.

4. Before the construction of super wear-resistant composite pipes, the pipes, accessories, specifications, lengths, quantities, positions, etc. shall be correctly mastered according to the drawings.

5. After cutting the pipe at right angles to the pipe, clean the burrs and cutting debris on the pipe end face.

6. Before the PE pipe is welded, the aluminum plastic composite layer shall be completely stripped.

7. It is forbidden to rotate the newly welded joint during processing.

8. The super wear-resistant composite pipe should not be pushed too hard when the heated pipe and pipe fittings are vertically aligned.

9. Indoor horizontal branch pipes are laid in the ground floor, and indoor vertical branch pipes are laid in the reserved pipe slots. Before the installation of indoor exposed pipes, the position of the reserved pipe groove shall be checked first to see if it is correct.


Recent browsing:

contact us

Address: No.37 Min'an Road, Zibo High tech Zone

Tel: 18815335818 Email: [email protected]

Website: daliren.cn Technical support:

Zibo Dingchang Xinlong Plastic Technology Co., Ltd. All rights reserved Record No.:



Product Center

  • Ultra wear-resistant composite pipe

    PE pipe

    MPP power pipe

    PE mining pipe

    45 degree high pressure elbow of steel mesh skeleton

    High voltage capacitor flange electrofusion of wire mesh framework

    Wire mesh framework electrofusion groove connector

    90 ° electric melting elbow of steel mesh skeleton

    Electrofusion direct

    High voltage electrofusion tee of wire mesh framework

    Steel mesh skeleton color pipeline


  • Mobile QR code