阿拉爱上海

Welcome to Zibo Dingchang Xinlong Plastic Technology Co., Ltd

 Untitled-3.png

 Universal banner
Your current location: home page > News > Industry News

contact us

Zibo Dingchang Xinlong Plastic Technology Co., Ltd

mobile phone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Telephone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Fax: 0533-3984111

website: daliren.cn

Email: [email protected]

Address: No. 37, Min'an Road, Zibo High tech Zone


How to do well in insulation measures of polyethylene composite pipe with steel mesh framework

2021-12-17
second

The arrival of winter also adds many difficulties to pipeline construction, especially in Northeast China, where a long period of subzero will lead to many pipelines freezing, bursting and damage. Therefore, thermal insulation measures should also be taken during pipeline construction, especially for the steel mesh skeleton polyethylene composite pipe commonly used now, thermal insulation is not required in the south where the temperature is relatively high, but it is necessary in the north.


 1562986909175090.jpg


Thermal insulation measures shall be taken for winter construction. Thermal insulation measures must be taken for composite pipes buried in frozen soil areas, and the buried depth should not be less than 0.5m. The buried depth of the pavement shall be more than 0.8m before passing. Indoor and outdoor open jackets, if frozen, should take thermal insulation measures.


The indoor exposed laying and non directly buried hot water pipes of the steel mesh skeleton polyethylene composite pipe shall be insulated. At the same time, the delivery temperature of the composite pipe shall not exceed 60 ℃. When the pipeline may condense or affect the environment, anti condensation insulation shall be used. When laying pipes, if the depth exceeds the freezing line, insulation is required.


When the steel mesh skeleton polyethylene composite pipe needs insulation, the thickness of the insulation material layer shall be determined according to the pipe length, water temperature, ambient temperature, water supply time and operation conditions. Winter weather will bring many problems to the steel mesh skeleton polyethylene composite pipe. First, insulation should be done well. During installation, pressure test and ponding, the steel mesh skeleton polyethylene composite pipe below 0 ° C will be damaged due to freezing.


label

Recent browsing:

Related products

Related news

contact us

Address: No.37 Min'an Road, Zibo High tech Zone

Tel: 18815335818 Email: [email protected]

Website: daliren.cn Technical support:

Zibo Dingchang Xinlong Plastic Technology Co., Ltd. All rights reserved Record No.:



Product Center

  • Ultra wear-resistant composite pipe

    PE pipe

    MPP power pipe

    PE mining pipe

    45 degree high pressure elbow of steel mesh skeleton

    High voltage capacitor flange electrofusion of wire mesh framework

    Wire mesh framework electrofusion groove connector

    90 ° electric melting elbow of steel mesh skeleton

    Electrofusion direct

    High voltage electrofusion tee of wire mesh framework

    Steel mesh skeleton color pipeline


  • Mobile QR code