Welcome to Zibo Dingchang Xinlong Plastic Technology Co., Ltd

 Untitled-3.png

 Universal banner
Your current location: home page > News > Corporate News

contact us

Zibo Dingchang Xinlong Plastic Technology Co., Ltd

mobile phone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Telephone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Fax: 0533-3984111

website: daliren.cn

Email: [email protected]

Address: No. 37, Min'an Road, Zibo High tech Zone


What should be paid attention to in the pressure test of steel mesh skeleton pipe?

2020-09-10
second

After the equipment system for pressure test of the steel mesh skeleton pipe is stabilized, the pressure will rise to 1.5 times of the working pressure, and the pressure will be stabilized for 1 hour. Carefully observe the pressure gauge and patrol along the line. With a stable pressure increase rate, the pressure will increase to the required pressure value, and the steel mesh composite pipe before or after backfilling.

1. The flange connection part of the steel mesh composite pipe shall be exposed and checked for leakage.

2. The pressure test can be conducted before or after backfilling, and the steel pipe shall be covered with soil at a certain interval. The coil shall be fixed at the original position during pressure test.

 PE steel mesh skeleton pipe.png

3. When the pressure measuring equipment system is stable, increase the pressure to 1.5 times of the working pressure, stabilize the pressure for 1 hour, carefully observe the pressure gauge, and patrol along the line. If there is no obvious leakage or pressure drop during the test, the pipeline will pass the pressure test.

4. Generally, after checking the air in the pipeline, the pressure should be increased to the required pressure value at a stable pressurization rate. The pressure gauge should be placed behind this part of pipeline as far as possible.

The above are the precautions for pressure test of steel wire skeleton pipe. The pressure test can be conducted before or after backfilling the steel mesh composite pipe. Pipes shall be covered with soil at intervals. If there is no obvious leakage or pressure drop during the test, the pipeline shall pass the pressure test.


Recent browsing:

contact us

Address: No.37 Min'an Road, Zibo High tech Zone

Tel: 18815335818 Email: [email protected]

Website: daliren.cn Technical support:

Zibo Dingchang Xinlong Plastic Technology Co., Ltd. All rights reserved Record No.:



Product Center

  • Ultra wear-resistant composite pipe

    PE pipe

    MPP power pipe

    PE mining pipe

    45 degree high pressure elbow of steel mesh skeleton

    High voltage capacitor flange electrofusion of wire mesh framework

    Wire mesh framework electrofusion groove connector

    90 ° electric melting elbow of steel mesh skeleton

    Electrofusion direct

    High voltage electrofusion tee of wire mesh framework

    Steel mesh skeleton color pipeline


  • Mobile QR code