阿拉爱上海

Welcome to Zibo Dingchang Xinlong Plastic Technology Co., Ltd

 Untitled-3.png

 Universal banner
Your current location: home page > News > Enterprise Dynamics

contact us

Zibo Dingchang Xinlong Plastic Technology Co., Ltd

mobile phone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Telephone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Fax: 0533-3984111

website: daliren.cn

Email: [email protected]

Address: No. 37, Min'an Road, Zibo High tech Zone


Analysis of the installation and water supply test of the steel skeleton plastic composite pipe sanitary ware

2022-06-18
second

1) First, according to the plane coordinates required in the drawing, locate the ground line, and plant expansion bolts on the ground and wall according to the scale of the appliance (and apply sealant on the bolts to avoid damage to the waterproof). The support and bracket of sanitary appliances must be firm and flat, and it is necessary to closely combine with the appliance;


2) Before all appliances are installed, it is necessary to remove the pipe plug such as the cover of the drain outlet, and clean the socket before installation;


3) The supports and brackets of sanitary appliances must be corrosion resistant, flat and firm, and in close and stable contact with appliances;


4) The water supply fittings of sanitary appliances shall be intact, with tight interfaces and sensitive opening and closing parts;


5) The quality requirements of sanitary appliances and devices shall be strictly in accordance with the construction acceptance standards and bidding technical standards; Full water and water test:


1) Before the completion of sanitary ware, floor drain, ground cleaning port and other devices, full water and water test shall be carried out by system (area, section);


2) For the indoor water supply system, whether all the large number of water distribution points that are open at the same time according to the planning requirements reach the additional flow;


3) For the indoor drainage system, open 1/3 of the water distribution points of the water supply system at the same time, and check whether the drainage points are unblocked and whether there is leakage at the interface;


4) Specific inspection method: after 15min of full water, the water surface drops, and then fill it for 5min of investigation. If the water level does not drop, all connectors such as angle valves and hoses do not leak, and water supply and drainage are dredged, it is qualified.


label

Recent browsing:

Related products

Related news

contact us

Address: No.37 Min'an Road, Zibo High tech Zone

Tel: 18815335818 Email: [email protected]

Website: daliren.cn Technical support:

Zibo Dingchang Xinlong Plastic Technology Co., Ltd. All rights reserved Record No.:



Product Center

  • Ultra wear-resistant composite pipe

    PE pipe

    MPP power pipe

    PE mining pipe

    45 degree high pressure elbow of steel mesh skeleton

    High voltage capacitor flange electrofusion of wire mesh framework

    Wire mesh framework electrofusion groove connector

    90 ° electric melting elbow of steel mesh skeleton

    Electrofusion direct

    High voltage electrofusion tee of wire mesh framework

    Steel mesh skeleton color pipeline


  • Mobile QR code