Welcome to Zibo Dingchang Xinlong Plastic Technology Co., Ltd

 Untitled-3.png

 Universal banner
Your current location: home page > News > Enterprise Dynamics

contact us

Zibo Dingchang Xinlong Plastic Technology Co., Ltd

mobile phone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Telephone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Fax: 0533-3984111

website: daliren.cn

Email: [email protected]

Address: No. 37, Min'an Road, Zibo High tech Zone


Precautions for installation of steel mesh skeleton plastic composite pipe

2022-03-31
second

① Because the steel mesh skeleton plastic composite pipe is a new type of pipe material, there is no special national standard and procedure. For planning, please refer to the Standard for Oil and Gas Gathering and Transportation Planning in Oil Fields (SY/T0004-98) [1] and its enterprise standard Technical Regulations for Installation of Steel Mesh Framework Plastic Composite Pipe (Q/TIDC 03-98) [2] for planning.



② Because of the connection method and pre processing characteristics of the steel skeleton composite pipe, the requirements for the scale of the miscellaneous process construction drawings are high, and it is a high-precision prefabricated type. Any change in scale and direction will lead to extension of construction period and increase of cost. This requires planners to accurately produce construction drawings, especially for some reconstruction projects, and to ensure reliable data.


Construction precautions


① Clad pipe shall be operated in strict accordance with the installation procedure of clad pipe, and operators shall receive pre job training


② The inspection, storage and transportation of pipes and fittings shall be strictly carried out according to the construction standards of composite pipes.


③ When installing pipes, pay attention to the fact that the zigzag is greater than the allowable radius of curvature when connecting; When laying on the ground, pipe buttresses and supports shall be built first. When laying underground, the pipe trench shall be opened and straight, and there shall be no rocks or gravels at the bottom of the trench. When backfilling, sand or plain soil shall be used to backfill to 0.3m, compacted in layers, and then the undisturbed soil shall be backfilled; Connect pipes or fittings in strict accordance with the requirements.


④ Make construction records and fill in archives


label

Recent browsing:

Related products

Related news

contact us

Address: No.37 Min'an Road, Zibo High tech Zone

Tel: 18815335818 Email: [email protected]

Website: daliren.cn Technical support:

Zibo Dingchang Xinlong Plastic Technology Co., Ltd. All rights reserved Record No.:



Product Center

  • Ultra wear-resistant composite pipe

    PE pipe

    MPP power pipe

    PE mining pipe

    45 degree high pressure elbow of steel mesh skeleton

    High voltage capacitor flange electrofusion of wire mesh framework

    Wire mesh framework electrofusion groove connector

    90 ° electric melting elbow of steel mesh skeleton

    Electrofusion direct

    High voltage electrofusion tee of wire mesh framework

    Steel mesh skeleton color pipeline


  • Mobile QR code