Welcome to Zibo Dingchang Xinlong Plastic Technology Co., Ltd

 Untitled-3.png

 Universal banner
Your current location: home page > News > Enterprise Dynamics

contact us

Zibo Dingchang Xinlong Plastic Technology Co., Ltd

mobile phone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Telephone: eighteen billion eight hundred and fifteen million three hundred and thirty-five thousand eight hundred and eighteen

Fax: 0533-3984111

website: daliren.cn

Email: [email protected]

Address: No. 37, Min'an Road, Zibo High tech Zone


What are the regulations for PE pipe link

2019-09-06
second

Pe pipe materials are widely used in the field of pipe manufacturing because of their high strength, non-toxic and other characteristics. Because it is not rusty, it is an ideal material to replace ordinary iron water supply pipes. Today, Dingchang Xinlong will introduce the regulations of PE pipe connection.

 PE pipe.png

[What are the regulations for PE management link]


1. Before the pipe connection, the pipe materials, piping and auxiliary equipment shall be inspected according to the design requirements, and the appearance inspection shall be carried out at the construction site. The pipes can only be used if they meet the conditions. The main inspection items are pressure resistance grade, consistency of external surface quality, matching quality, material, etc.


2. Special heating tools with different interface forms shall be used, and open fire shall not be used to heat pipes and tubes.


3. Pipes connected by welding are suitable for pipes and materials with the same number. Pipes with similar performance can be tested first and then tested if they are qualified.


In order to keep the temperature of the pipes consistent with that of the pipes, the pipes shall be connected after being placed at the construction site for a certain time.


5. When connecting in cold climate (below~5 ℃) and strong wind environment, protective measures shall be taken or connection procedures shall be adjusted.


6. During pipe connection, one end of the pipe shall be kept clean. At the end of each work, the pipe mouth shall be temporarily closed to prevent sundries from entering the pipe.


7. The steel pipe must be connected for visual inspection. Those who fail will be back soon.


label

Recent browsing:

Related products

Related news

contact us

Address: No.37 Min'an Road, Zibo High tech Zone

Tel: 18815335818 Email: [email protected]

Website: daliren.cn Technical support:

Zibo Dingchang Xinlong Plastic Technology Co., Ltd. All rights reserved Record No.:



Product Center

  • Ultra wear-resistant composite pipe

    PE pipe

    MPP power pipe

    PE mining pipe

    45 degree high pressure elbow of steel mesh skeleton

    High voltage capacitor flange electrofusion of wire mesh framework

    Wire mesh framework electrofusion groove connector

    90 ° electric melting elbow of steel mesh skeleton

    Electrofusion direct

    High voltage electrofusion tee of wire mesh framework

    Steel mesh skeleton color pipeline


  • Mobile QR code